Constrained Optimization of Workforce Allocation under Time-Varying Operational Uncertainty
Keywords:
Workforce Allocation; Robust Optimization; Adaptive Uncertainty; Forecast Error; Time-Varying Demand; Convex Optimization; Staffing; Operational UncertaintyAbstract
Workforce planning under the simultaneous uncertainty and stochasticity of demand requires a balancing act between reliability, labour costs, and nimbleness of operations. Conventional robust workforce planning problems model the uncertainty radius as a parameter, specified externally to the model; however, operational uncertainty propagates as forecast errors unfold. A parsimonious adaptive robust workforce planning model is constructed in which the uncertainty radius, when applied to the current planning horizon, is updated based on the absolute forecast error realized during the immediately preceding period. The proposed mechanism is defined by ????????+1 = ????0 +???? ∣ ???????? −???????? ∣, where ????0is the baseline uncertainty level and ???? controls feedback responsiveness. The resulting workforce problem aims to minimize the costs of the typical workforce, the penalties for shortages, and the costs of transitioning across periods, within workforce capacity constraints. A further contribution to the structure is an exact explicit representation of the solution to the continuous one period problem; since the cost function is convex and piecewise linear, the optimal workforce level is obtained by evaluating a finite set of candidates: the feasible boundary points, the previous period's workforce, and the demand breakpoint of the robust demand. A contraction result is also established, indicating that the feedback workforce allocation map is contractive.0 ≤ ???? < 1 under stationary conditions. Numerical experiments over 120 periods and 500 replications compare low-uncertainty, time-varying-uncertainty, and shock environments. Results show that feedback has little value under stable low uncertainty, but substantially reduces shortage cost and service violations under dynamic and shock-prone uncertainty. In the time-varying environment, ???? = 0.60reduces mean total cost by 3.31%, shortage cost by 58.41%, and service violations by 55.05% relative to the nonadaptive benchmark. In the shock environment, the strongest tested feedback level ???? = 0.95, reduces total cost by 9.73%, shortage cost by 34.44%, and service violations by 46.04%. The results demonstrate that forecast-error feedback provides a mathematically simple and operationally interpretable extension of robust workforce allocation.
Downloads
Downloads
Published
Issue
Section
License
You are free to:
- Share — copy and redistribute the material in any medium or format for any purpose, even commercially.
- Adapt — remix, transform, and build upon the material for any purpose, even commercially.
- The licensor cannot revoke these freedoms as long as you follow the license terms.
Under the following terms:
- Attribution — You must give appropriate credit , provide a link to the license, and indicate if changes were made . You may do so in any reasonable manner, but not in any way that suggests the licensor endorses you or your use.
- No additional restrictions — You may not apply legal terms or technological measures that legally restrict others from doing anything the license permits.
Notices:
You do not have to comply with the license for elements of the material in the public domain or where your use is permitted by an applicable exception or limitation .
No warranties are given. The license may not give you all of the permissions necessary for your intended use. For example, other rights such as publicity, privacy, or moral rights may limit how you use the material.

